Important Change in River Level Measurements

Beginning on November 1, 2016, the District started using a new vertical datum, the North American Vertical Datum of 1988 (NAVD88). In the past, the District has used the National Geodetic Vertical Datum of 1929 (NGVD29). The new datum results in a downward shift of between 0.64 to 0.90 feet depending on location. There is no change in the actual river level, only the value used to represent the level is different.

More information about the vertical datum change may be found at http://www.mysuwanneeriver.com/VerticalDatum or by calling the District offices at 386-362-1001 and asking to speak with Tom Mirti, Director of Water Resources.


Last 30 Days

Hart Springs

Station ID: 02323150    River Mile: 43    Flood Stage: Not established

Date Stage
Mar 293.48
Mar 303.60
Mar 313.67
Apr 13.33
Apr 23.19
Apr 33.42
Apr 43.82
Apr 53.68
Apr 63.36
Apr 73.14
Apr 83.25
Apr 93.34
Apr 103.46
Apr 113.53
Apr 123.56
Apr 133.48
Apr 143.52
Apr 153.55
Apr 163.64
Apr 173.57
Apr 183.51
Apr 193.35
Apr 203.26
Apr 213.32
Apr 223.33
Apr 233.30
Apr 243.31
Apr 253.20
Apr 263.33
Apr 273.26