Important Change in River Level Measurements

Beginning on November 1, 2016, the District started using a new vertical datum, the North American Vertical Datum of 1988 (NAVD88). In the past, the District has used the National Geodetic Vertical Datum of 1929 (NGVD29). The new datum results in a downward shift of between 0.64 to 0.90 feet depending on location. There is no change in the actual river level, only the value used to represent the level is different.

More information about the vertical datum change may be found at http://www.mysuwanneeriver.com/VerticalDatum or by calling the District offices at 386-362-1001 and asking to speak with Tom Mirti, Director of Water Resources.


Last 30 Days

Hart Springs

Station ID: 02323150    River Mile: 43    Flood Stage: Not established

Date Stage
Aug 224.37
Aug 234.34
Aug 244.36
Aug 254.28
Aug 264.07
Aug 273.89
Aug 283.88
Aug 293.85
Aug 303.72
Aug 313.60
Sep 13.75
Sep 23.68
Sep 33.68
Sep 43.74
Sep 53.81
Sep 63.97
Sep 73.79
Sep 83.62
Sep 93.34
Sep 103.00
Sep 114.41
Sep 124.72
Sep 135.75
Sep 147.57
Sep 159.00
Sep 1610.08
Sep 1710.67
Sep 1810.94
Sep 1910.91
Sep 2010.73