Important Change in River Level Measurements

Beginning on November 1, 2016, the District started using a new vertical datum, the North American Vertical Datum of 1988 (NAVD88). In the past, the District has used the National Geodetic Vertical Datum of 1929 (NGVD29). The new datum results in a downward shift of between 0.64 to 0.90 feet depending on location. There is no change in the actual river level, only the value used to represent the level is different.

More information about the vertical datum change may be found at http://www.mysuwanneeriver.com/VerticalDatum or by calling the District offices at 386-362-1001 and asking to speak with Tom Mirti, Director of Water Resources.


Last 30 Days

Hart Springs

Station ID: 02323150    River Mile: 43    Flood Stage: Not established

Date Stage
Jul 165.38
Jul 175.30
Jul 185.21
Jul 195.21
Jul 205.24
Jul 215.19
Jul 225.83
Jul 235.97
Jul 246.07
Jul 256.31
Jul 266.55
Jul 276.71
Jul 286.84
Jul 296.94
Jul 307.06
Jul 317.18
Aug 17.18
Aug 27.23
Aug 37.29
Aug 47.37
Aug 57.50
Aug 67.67
Aug 77.83
Aug 87.99
Aug 98.10
Aug 108.12
Aug 118.10
Aug 128.05
Aug 138.00
Aug 147.91