Important Change in River Level Measurements

Beginning on November 1, 2016, the District started using a new vertical datum, the North American Vertical Datum of 1988 (NAVD88). In the past, the District has used the National Geodetic Vertical Datum of 1929 (NGVD29). The new datum results in a downward shift of between 0.64 to 0.90 feet depending on location. There is no change in the actual river level, only the value used to represent the level is different.

More information about the vertical datum change may be found at http://www.mysuwanneeriver.com/VerticalDatum or by calling the District offices at 386-362-1001 and asking to speak with Tom Mirti, Director of Water Resources.


Last 30 Days

Hart Springs

Station ID: 02323150    River Mile: 43    Flood Stage: Not established

Date Stage
Oct 265.00
Oct 274.99
Oct 285.00
Oct 294.77
Oct 304.55
Oct 314.55
Nov 14.63
Nov 24.66
Nov 34.59
Nov 44.52
Nov 54.50
Nov 64.42
Nov 74.33
Nov 84.24
Nov 94.15
Nov 103.80
Nov 113.66
Nov 123.74
Nov 133.64
Nov 143.60
Nov 153.59
Nov 163.66
Nov 173.78
Nov 183.97
Nov 193.86
Nov 203.57
Nov 213.81
Nov 223.74
Nov 233.70
Nov 243.49