Important Change in River Level Measurements

Beginning on November 1, 2016, the District started using a new vertical datum, the North American Vertical Datum of 1988 (NAVD88). In the past, the District has used the National Geodetic Vertical Datum of 1929 (NGVD29). The new datum results in a downward shift of between 0.64 to 0.90 feet depending on location. There is no change in the actual river level, only the value used to represent the level is different.

More information about the vertical datum change may be found at http://www.mysuwanneeriver.com/VerticalDatum or by calling the District offices at 386-362-1001 and asking to speak with Tom Mirti, Director of Water Resources.


Last 30 Days

Branford

Station ID: 02320500    River Mile: 76    Flood Stage: 25

Date Stage
Mar 2210.30
Mar 2310.24
Mar 2410.24
Mar 2510.25
Mar 2610.23
Mar 2710.24
Mar 2810.35
Mar 2910.41
Mar 3010.43
Mar 3110.26
Apr 110.12
Apr 210.04
Apr 39.98
Apr 49.95
Apr 59.86
Apr 69.81
Apr 79.95
Apr 89.89
Apr 99.92
Apr 1010.12
Apr 1110.10
Apr 1210.20
Apr 1310.29
Apr 1410.30
Apr 1510.50
Apr 1610.40
Apr 1710.50
Apr 1810.62
Apr 1910.65
Apr 2010.64