Important Change in River Level Measurements

Beginning on November 1, 2016, the District started using a new vertical datum, the North American Vertical Datum of 1988 (NAVD88). In the past, the District has used the National Geodetic Vertical Datum of 1929 (NGVD29). The new datum results in a downward shift of between 0.64 to 0.90 feet depending on location. There is no change in the actual river level, only the value used to represent the level is different.

More information about the vertical datum change may be found at http://www.mysuwanneeriver.com/VerticalDatum or by calling the District offices at 386-362-1001 and asking to speak with Tom Mirti, Director of Water Resources.


Last 30 Days

Branford

Station ID: 02320500    River Mile: 76    Flood Stage: 25

Date Stage
Feb 2712.95
Feb 2812.77
Mar 112.65
Mar 212.48
Mar 312.26
Mar 412.07
Mar 511.92
Mar 611.78
Mar 711.65
Mar 811.52
Mar 911.39
Mar 1011.31
Mar 1111.21
Mar 1211.14
Mar 1311.07
Mar 1410.97
Mar 1510.84
Mar 1610.75
Mar 1710.66
Mar 1810.59
Mar 1910.49
Mar 2010.40
Mar 2110.32
Mar 2210.22
Mar 2310.12
Mar 2410.02
Mar 259.95
Mar 269.86
Mar 279.77
Mar 289.77