Water Level Data for the Last 30 Days

Dowling Park

Station ID: 02319800    River Mile: 113    Flood Stage: 47

Date Stage
Feb 2632.28
Feb 2731.76
Feb 2831.23
Mar 130.69
Mar 230.23
Mar 329.80
Mar 429.39
Mar 528.97
Mar 628.62
Mar 728.30
Mar 827.97
Mar 927.64
Mar 1027.41
Mar 1127.18
Mar 1227.20
Mar 1327.11
Mar 1427.30
Mar 1527.43
Mar 1627.37
Mar 1727.27
Mar 1827.29
Mar 1927.46
Mar 2027.58
Mar 2127.60
Mar 2227.56
Mar 2327.53
Mar 2427.49
Mar 2527.38
Mar 2627.16
Mar 2727.10


Important Change in River Level Measurements

Beginning on November 1, 2016, the District started using a new vertical datum, the North American Vertical Datum of 1988 (NAVD88). In the past, the District has used the National Geodetic Vertical Datum of 1929 (NGVD29). The new datum results in a downward shift of between 0.64 to 0.90 feet depending on location. There is no change in the actual river level, only the value used to represent the level is different.

More information about the vertical datum change may be found at http://www.mysuwanneeriver.com/VerticalDatum or by calling the District offices at 386-362-1001 and asking to speak with Tom Mirti, Director of Water Resources.